Gwel Y Fenai, caernarfon

About the application

Draft Planning application documents

Gwel Y Fenai documents

Gwel y Fenai Business Park
Gwel y Fenai Resort Visuals

Gwel y Fenai Resort Entrance Visuals
Location plan Gwel y Fenai
Topographical survey
Existing building plan B1-1
Existing building plan B1-2
Existing building B1 elevations 1
Existing building B1 elevations 2
Existing building B1 elevations 3
Existing building B1 sections B1
Existing building B1 plan B2
Existing building B2 elevations
Existing building B3 elevations
Proposed masterplan
Proposed masterplan commercial
Existing site sections
Proposed site sections
Lodge standard plan and elevations
Hub Building – ground floor plan
Hub Building – first floor plan
Hub Building – second floor plan
Hub Building – third floor plan
Hub Building – roof terrace plan
Hub Building – roof plan
1 Bed apartments – plans
2 Bed apartments – plans
Hub proposed elevations
Hub proposed sections
Hub proposed visuals
Demolition plan
Commercial Unit 1 – floorplans, elevations and sections
Commercial Unit 1 – floorplans, sections and elevations
Commercial Unit 2 – floorplans, sections and elevations
Commercial Unit 2 – 3d visuals
Flood Consequence Assessment
FCA Appendix A
FCA Appendix B
FCA Appendix C
FCA Appendix D
FCA Appendix E
FCA Appendix F
FCA Appendix G
Foul Water Management Report
Foul Water Management Report – Appendix A
Foul Water Management Report – Appendix B
Foul Water Management Report – Appendix C
Foul Water Management Report – Appendix D
Foul Water Management Report – Appendix E
Foul Water Management Report – Appendix F
Foul Water Management Report – Appendix G
Foul Water Management Report – Appendix H
Foul Water Management Report – Appendix I
Foul Water Management Report – Appendix J
Surface Water Management Report
Surface Water Management Report – Appendix A
Surface Water Management Report – Appendix B
Surface Water Management Report – Appendix C
Surface Water Management Report – Appendix D
Surface Water Management Report – Appendix E
Surface Water Management Report – Appendix F
Surface Water Management Report – Appendix G
Surface Water Management Report – Appendix H
Surface Water Management Report – Appendix I
Landscape and Visual Impact Assessment
Landscape and Visual Impact Assessment - figures
Landscape and Visual Impact Assessment – viewpoints

Cadnant Planning Ltd has been commissioned by Maybrook Investments Ltd to undertake a pre-application consultation (PAC) in respect of proposed development on Gwel y Fenai (former Ferrodo site and Plas Brereton), Bangor Road, Caernarfon, LL55 1TP.

 

We give notice that Maybrook Investments Ltd is intending to apply for the development of a holiday and leisure park to include 208 holiday lodges; 51 new-build holiday apartments; change of use of building to 4 holiday apartments; a leisure hub building; re-configuration and renovation of industrial units; provision of a private water treatment plant; and,  associated car parking, landscaping, access and internal access roads.

 

Prior to formal submission to the Local Planning Authority and in accordance with the requirements set out in Part 1A of the Town & Country Planning (Development Management Procedure) (Wales) (Amendment) Order 2016, the proposal will be subject to pre-application consultation.

A public consultation event will be held on 6th November between 4pm and 7pm at Caernarfon Town Football Club, The Oval, Marcus Street, Caernarfon, Gwynedd LL55 2HT. 

Our offices

© 2018 Cadnant Planning. All Rights Reserved.

 

Cadnant Planning Ltd Company Registered in England & Wales No. 07955299
VAT Registration No.13274751

Customer Privacy Notice - click here

© 2023 by ITG. Proudly created with Wix.com

  • Twitter
  • Facebook
  • LinkedIn - Black Circle